U.S. Department of Energy (DOE), Advanced Materials and Manufacturing Technologies Office (AMMTO) in collaboration with Partnership Intermediary, EnergyWerx announces the Accelerating Intelligent Materials & Manufacturing Systems (AIM2S) Funding Opportunity. This Opportunity is focused on integrating artificial intelligence (AI) technologies to address bottlenecks in the U.S. energy manufacturing industrial base, including critical-materials supply chains, materials qualification, product quality, throughput, process consistency, cost, and adoption of new materials and processes. The Opportunity targets production-relevant validation and measurable improvements across energy manufacturing.
Background
In November 2025, the U.S. Department of Energy launched the Genesis Mission, a national initiative aimed at transforming scientific discovery and engineering productivity through AI and advanced computing. Advanced materials and manufacturing are among the 26 national challenge areas, where AI-enabled innovation can accelerate American leadership, strengthen domestic supply chains, and improve the transition of promising technologies from research to deployment.
Despite significant advances in materials discovery, process modeling, automation, and manufacturing data infrastructure, promising technologies often encounter substantial barriers when transitioning from laboratory-scale validation to production-relevant environments. These barriers are particularly acute in energy-relevant manufacturing sectors characterized by complex system integration, stringent performance requirements, sensitive technical data, and the need for reliable qualification pathways.
The development and testing of new AI technologies that advance both materials innovation and intelligent manufacturing systems relevant to U.S. energy technologies will be prioritized for applications with a clear pathway to high-impact energy products, including but not limited to batteries, grid components (e.g., conductors and transformers), magnets, and high-performance components for aggressive operating environments, and other advanced materials and manufacturing applications that support domestic energy manufacturing capacity.
Because AI-enabled materials and manufacturing systems may involve sensitive technical data, proprietary process information, connected equipment, and operational technology environments, projects should incorporate appropriate risk-based cybersecurity, data governance, and access-control practices commensurate with the project scope and deployment context. These needs establish the basis for AIM2S as a targeted to advance AI-enabled materials and manufacturing technologies toward production-relevant validation.
The U.S. energy manufacturing sector faces persistent, system-level challenges that limit the speed, scalability, quality, cost-effectiveness, and resilience of domestic production. These challenges (listed in Table 1) include limited production throughput, high defect rates, inconsistent product quality, high manufacturing costs, long materials qualification timelines, challenging supply chains, limited scalability of manufacturing processes, and fragmented data across materials, processes, equipment, and supply chains. To address these challenges, there is a critical need to leverage data-driven approaches, artificial intelligence (AI), adaptive control, and system-level optimization to improve performance, reliability, and scalability of energy-relevant materials and manufacturing systems.

AIM2S will complement broader DOE AI efforts by focusing on AI-enabled materials and manufacturing technologies that bridge the gap between foundational research and production-relevant validation. The effort will emphasize materials qualification, manufacturing process integration, equipment-level automation, and system-level optimization for energy-relevant applications. It aims to accelerate the integration of advanced materials into energy systems by utilizing AI technologies, focusing on high-performance materials for power generation, grid transmission, and energy storage. For power generation applications, areas of interest include those utilizing nuclear, fossil, geothermal, and hydropower energy sources.
Projects are expected to advance technologies from Technology Readiness Level (TRL) 3 and Manufacturing Readiness Level (MRL) 4 toward TRL 6 and MRL 7, helping bridge the gap between foundational research and pilot-scale demonstration. Performer projects should define the starting maturity level, target maturity level, technical basis for advancement, and quantitative evidence needed to demonstrate progress.
The Opportunity is organized around two complementary objectives:
The expectation is to advance materials development approaches and/or manufacturing processes through AI-enabled approaches. This activity focuses on mid-stage technology maturation, TRL 3–6 and/or MRL 4-7, bridging foundational research and early-stage validation through lab-scale or production-relevant demonstration. By supporting early-stage innovation, the program seeks to establish a pipeline of AI-enabled technologies that can be advanced toward pilot-level production or deployment within approximately 24 months.
Expected outcomes include a quantifiable reduction in materials qualification and certification timelines (30-50% decrease), validated digital qualification frameworks demonstrated with industry partners, successful insertion of priority materials into pilot-scale manufacturing systems (2x acceleration), and transformative improvements in manufacturing performance, including throughput (2x improvement), quality (20-40% improvement), yield (20-40% improvement), reliability (50% improvement), cost (25-50% reduction), scrap reduction (20-40% reduction), process stability (50% improvement), and readiness for pilot-scale production or deployment. Expected outcomes also include clearly defined commercialization pathways to enhance domestic supply chain resilience. Each performer project should define a specific material, component, process, equipment system, workflow, or application-relevant end goal and demonstrate measurable progress toward that end goal using quantitative technical, manufacturing, and/or commercialization metrics.
Technology Developers are recommended to have an Industrial Host Site. To facilitate connections between Technology Developers and potential Host Sites, EnergyWerx is compiling a Teaming Partner List[1] for this Opportunity. The Teaming Partner List allows entities that may wish to participate in a project to express their interest to other applicants and explore potential partnerships.
Submission Window: November _, 2026 - March _, 2027January 13, 2027 at 3:00 PM ETThe AIM2S Opportunity launched on [MONTH] [DATE], 2026. Please click here for the full announcement article for more information.
Informational Webinars: DOE will present and summarize the details of the AIM2S Opportunity. Potential applicants will gain a better understanding of the Opportunity's scope, scale, and intent and have the opportunity to ask questions of DOE staff.

downloading the Microsoft Teams software to your computer, smartphone, or tablet.The anticipated program schedule and funding structure are:

Detailed scope, deliverables, performance metrics, and milestones will be finalized in each performer's Business-to-Business (B2B) agreement.
Submission Window: November _, 2026 - March _, 2027January 13, 2027 at 3:00 PM ETWe encourage participation by a broad range of performers, including non-traditional organizations, small businesses, startups, universities, national laboratories, nonprofit entities, and industry teams. This is designed to advance high-impact solutions without requiring traditional large-scale internal computing infrastructure to achieve sufficient technical capability or access to relevant data and validation environments. Please note that while national labs may participate, they are not eligible to be the prime and federal share is limited to 10% (in aggregate) to the total project cost.
Eligible Applicants
AMMTO will determine whether the team has sufficiently:
This will be graded by reviewing the following 3 criteria sections:
Criteria 1: Technical Description, Innovation, and Readiness
Assess the novelty, technical approach, maturity, and commercial viability of the proposed technology; such as:
Specific to Topic Area 1:
Specific to Topic Area 2:
Criteria 2: Workplan, Milestones, and Project Management
Assess the completeness, logic, feasibility, and risk management of the proposed project approach; such as:
Criteria 3: Technical Qualifications and Resources
Assess the capabilities, track record, facilities, and partner commitments of the project team; such as:
Reviewers will grade each project’s Criteria section from 0 - 10 using the following scale:
Each Criteria will have the following weight to establish a final score (0 - 10) for the proposal:
Additionally, DOE reserves the right to require additional or clarifying information regarding the application submissions, the team, and any other matters related to the anticipated funding. If DOE contacts an applicant for additional or clarifying information, it does not signify that the applicant has been selected for negotiation of award or that the applicant is among the top ranked applications. Applicants selected for negotiation will be required to agree to standard DOE funding legal terms and conditions.
Projects should start at TRL 3 and/or MRL 2 and define a credible path toward TRL 6 and MRL 4 through lab-scale or production-relevant prototypes and validation.
The program is intended for domestic startups, small businesses, established industry, universities, national laboratories, and nontraditional partners that meet the eligibility and research-security requirements.
DOE anticipates up to $20 million in total performer funding, with expected awards of approximately $1.1 million to $2.2 million per performer. The base period is one year, with one optional one-year continuation, for a maximum of 24 months.
Projects must advance a defined energy-relevant material or manufacturing outcome. Priority application areas include grid infrastructure, energy storage, and power generation systems, including gas, nuclear, hydropower, geothermal, and coal.
No. AIM2S emphasizes measurable progress toward a material, component, process, equipment system, workflow, or application outcome rather than AI model development in isolation.
FFRDCs (e.g. DOE/National Nuclear Security Administration National Laboratories) may participate as a subrecipient; however, DOE will not directly fund FFRDCs under this program. Selectees will receive full funding through one agreement with EnergyWerx. Selectees are solely responsible for funding and executing necessary agreements with subrecipients. ENWX and DOE will not be involved in nor assist in these activities. FFRDC effort, in aggregate, shall not exceed 10% of total federal share of the project.
Yes, this funding Opportunity has a 20% cost share requirement in X phases.

Cost share is the portion of the costs of the project(s) not borne by the Federal government. Cost sharing augments federal funding to increase the project’s impact. It also ensures that recipients have a financial stake in the success of the project(s).
In the case of this program, cost share is required for all milestones. For example, for a particular milestone, the performer is eligible to receive payments of up to $300,000. If costs total $200,000 for the same milestone, the program can award up to $160,000, with the awardee responsible for funding the remaining $40,000 of cost. If the costs are greater than or equal to $375,000, the program can award the full $300,000 in this milestone. The full award amount is provided once all necessary milestones are satisfactorily completed.
Selectee’s cost share must come from non-federal sources, such as project participants, state or local governments, or other third-party financing. DOE Loan Guarantees cannot be leveraged by applicants to provide the required cost share or otherwise support the same scope that is proposed under a project. Cost share may be provided by the performer or third parties (entities that do not have a role in performing the scope of work). Any partial donation of goods or services is considered a discount and is not allowable.
Cash contributions include but are not limited to personnel costs, fringe costs, supply and equipment costs, indirect costs, and other direct costs.
Examples of what is not allowable as cost share include funding from any other federal award, foregone fee or profits, or other costs incurred prior to signing the B2B agreement. For more information, please refer to 2 C.F.R. 200.306.
Examples of eligible financing options include internal capital, Small Business Administration guaranteed (SBA) loans, loans from private lenders (e.g., banks, VC firms, Community Development Funds), certain utility rebates, and State and Local programs in which the funding does not originate from a Federal source.
The entity/applicant is required to provide written assurance of its proposed cost share contributions in its application. If selected for an award, applicants will be required to provide documentation showing that they will meet cost share requirements. If cost share is not met, DOE may terminate the agreement, and no further funding will be available. Note that awards requiring cost share are paid out as milestone reimbursements for 20% of the eligible costs incurred to date, so appropriate cost share (e.g., invoices) will need to be documented and reported to EnergyWerx.
No, selectees may not use the same cash or in-kind contributions to meet cost share requirements for more than one project. See 2 C.F.R. 200.306 for additional context.
PIA selectees under this opportunity are required to undergo due diligence review by the Office of Research, Technology and Economic Security (RTES). DOE may require selected organizations to provide Transparency on Foreign Connections (TFC) and/or Current and Pending Support documentation for key members of the project team during the due diligence review process. A template form for TFC disclosure and certification can be found here: https://www.energy.gov/ia/transparency-foreign-connections. The common form for Current and Pending (Other) Support can be found here: https://www.energy.gov/ia/current-and-pending-other-support.
Proprietary application materials marked appropriately remain protected for evaluation use only.
Under a PIA project, the Government holds limited rights to pre-existing data (background IP), restricting its use to evaluation and oversight.
Conversely, the Government generally acquires broad or unlimited rights to foreground data generated during the project, including the right to require delivery, use the data, and make it public pursuant to DOE's statutory dissemination mandate. Exceptions apply with DOE approval: patentable data may be withheld temporarily to file patent applications, non-essential data may be exempted from delivery, and certain data may be protected from public disclosure for a set period (typically up to five years), depending on statutory authority.
Performers may copyright works, including software, developed under the project, subject to a royalty-free government-use license.
For subject inventions, domestic small businesses and non-profits retain ownership, provided they report inventions to DOE, grant a non-exclusive government-use license, and adhere to U.S. manufacturing requirements. Other entities may request comparable rights via a DOE patent waiver.
All intellectual property, confidentiality, and data-rights terms flow down to project subrecipients and partners.